All-inclusive home improvement including what part of the house decoration all-inclusive and half-package what is the difference

The decoration methods are mainly divided into two types: full-package and half-package. All-inclusive, that is, package materials, are all covered by the decoration company, so that the owners can be more relaxed. What are the parts of the all-inclusive home improvement package and what is the difference between the house decoration package and the half package? Take a look together to know!

What are the parts of all-inclusive home improvement?

First, the basic decoration part of the whole packaging repair (including the need for decoration of the auxiliary materials and labor)

1. Modification of interior wall: It mainly includes the dismantling part of the old wall, the part of the masonry wall, the ticking of the wire trough, and the construction of the water pipe type isomer negotiated by the owner.

2. It is also necessary to provide water pipes (cold and hot water pipes), electric wires (strong and weak electricity), trachea materials and installation and laying works for the family.

3, the toilet needs to be laid drainage pipe, light material backfill, leveling treatment.

4, kitchen, bathroom, balcony wall (not less than 1.8 meters) and the ground waterproof treatment.

5, the leveling of the room floor

6, bathroom, kitchen, living terrace tiles, wall tiles

7, wall surface, top surface scraping putty, surface brush latex paint

8, bathroom ware, hardware installation

Second, the decoration part of the package (including all auxiliary materials and labor)

1, TV wall modeling, living room, dining room, master bedroom, entrance, cloakroom ceiling.

2, wooden part: mainly including shoe or TV cabinets, kitchen hanging cabinets and so on.

What is the difference between house decoration and half package?

1, the overall difference

All-inclusive Home Furnishing The entire renovation process was contracted by the decoration company. From the initial design to the later details of the renovation, the decoration company was responsible. The owner only needs to refer to the relevant design, point out relevant issues, and finally accept and accept it. The half package is another form. The owner needs to be responsible for purchasing the main material, and the design and accessories are provided by the decoration company or the construction team.

2, from the time point of view, all-inclusive to save the decoration time

With full-package repairs, households do not need to spend time and energy on fitting-out purchases, which is very suitable for office workers. At the same time, due to the decoration company's understanding of the decoration market, they have their own fixed supply channels, so the purchase of materials is very convenient, and there is corresponding protection in quality. Therefore, the renovation of all-inclusive packages can greatly save time and effort, and at the same time make up for the shortcomings of insufficient household expertise.

3, the difference between the decoration price, half a bag is more economical, but also more worry

If the decoration is all-inclusive, the construction contractor will include the material, so it is definitely more expensive than half the package. While half of the package is purchased by the owners, the owners can purchase materials according to their own needs and economic conditions when purchasing materials, so that they can save more money and are more assured in terms of quality.

With regard to the contents of the all-inclusive home improvement package and the difference between the house decoration package and the half package, I hope to help everyone? There are advantages in all-inclusive and half-fitting decoration, so it is recommended that the owners can choose the decoration method according to their own needs.