Analyze the optimal installation position of the intelligent radar level gauge

Huajiang Automation analyzes the optimal installation position of the intelligent radar level gauge. The standard installation of the intelligent radar level gauge includes:

The marking shall point to the tank wall and the mounting marking shall be located at the right half of the waist of the two screw holes of the flange;

The orientation of the flange, in order to confirm the position, is marked on the flange or turnbuckle. When installing, the mark must meet: 1. The finger of the flange should point to the core of the tank wall or tank. 2. If using a waveguide installation, the flange marking should point to the side of the opening. 3. If using a bypass pipe installation, the flange mark should be on the side that points to the communication pipe.

In the application process of the intelligent radar level gauge, the amplitude of the echo signal indicates whether the installation position is the best. The solid material should be used for the purpose. If the amplitude of the echo signal is low, the flange can be rotated, and each hole is rotated to make the interference echo. Achieve the minimum. Extra can also be stored through false echoes to achieve the best survey results.

The steps are as follows:

1) Before the process of opening the tank is connected, it must be clearly recognized that there is no pressure in the tank and there is no harmful medium.

2) It should be clearly recognized that the empty tank or material level in the vessel should be positioned and debugged under the condition of covering the bottom of the tank. The positioning and debugging can also be carried out under the condition of less material level; it can be stored by false echo, and the radar level gauge The echo signal is optimized.

3) Turn the flange mark to a hole position, or turn the turnbuckle by 1/8 turn, pay attention to the amplitude, and then rotate the flange or turnbuckle until the turn is turned off to locate the best position of the echo signal.

4) Fix the flange at the optimal position or tighten the turnbuckle. If it is indispensable, change it to seal tightly.

Http://news.chinawj.com.cn Analyze the optimal installation position of the intelligent radar level gauge Submission: 'Analyze the best installation position of the intelligent radar level gauge

Grow Light Cob Waterproof

2020 hot sale 50w 100w 150w cob grow light, waterproof IP67, use Epistar 50w cob flip chip, pink lighting/3500k white lighting for you to choose.

50w 1pcs cob chip, can replace hps 300w;

100w 2pcs cob chip, can replace hps 500w;

150w 3pcs cob chip, can replace hps 1000w.


Waterproof Best Cob Led Grow Light, is your best choose for indoor plants, each lamp with bracket, easily install.

50w:

Best Cob Led Grow Light

100w:

Diy Cob Led Grow Light

150w:

566565


Cob Led Chip,Best Cob Chip,Led Cob Chip Grow Light,Cob Chip On Board Technology

Shenzhen Wenyi Lighting Technology Co., Ltd , https://www.szwenyigrow.com