Villa Design Entrance Decoration Furniture Furniture Decoration Door Price Decoration Steps & Budget Decoration Style Function Sofa Bed Cloth Sofa Marble Table Marble Tile Antique Floor Antique Tile Floor Tile Function Sofa Tile Glue Tile Price Floor Tile Decorative Metal Stampings,Decorative Stamped Sheet Metal,Metal Stampings,Sheet Metal Stamping Xiamen XMillion Co.,Ltd. , https://www.xmilliondoor.com
One, inspection room
And property management people go to the inspection room (preferably one or two people who understand the point). A few big Dongdong--
1. Waterway: Is the incoming water pipe connected? Is the waterproof condition of the sewer pipe and the waterproof layer better?
2, the circuit: strong wire (220V) does not enter the home, the entrance line is not more than 6 square millimeters? Weak wire (telephone network, etc.) did not enter the home?
3, civil engineering: whether the formation of the wall? Is there a crack? Civil cement powder (the surface of the world wall) cement marking is not high enough
4, doors and windows: whether it is installed according to the requirements of the purchase contract, the installation of the firm?
5, indoor area measurement: the use of detailed measurement area (renovation design needs), whether the area is consistent with the purchase contract?
If there is no problem with the above Dongdong, you can really press the room, oh, there may be some minor problems, you only need to think about the matter to the staff of the property management on the line. Oh, you can go to the next step!
Second, the design (of course design this piece or suggest that you find a professional designer, design is the soul of decoration, a good designer will take into account all aspects of life in the future, a good communication with the designer, the designer will press you The requirements are combined with his design to show its completeness. This will bring great convenience. A good designer will let you spend the least money to achieve the best results.)
1, the layout of the house: According to their own understanding of the functional areas of the house, like the style of design. During this period, you run the building materials market more and learn about various materials (including price, which is related to the design cost).
, plates, lacquers, etc. (Too much is not counted). After your careful discussion, draw a floor plan and a floor plan. Then according to the layout, repeated scrutiny to find the best solution!
Special note is: in the design from. . . Practical (to be convenient) - safety (such as the use of some handles, the treatment of wall angle, etc.) - environmental protection (material) - beautiful (reasonable use of space) - style
2. Drawing of construction drawings (The workers are working according to the plans, and they will achieve the original design effect.. Ha ha. People do not do everything for themselves. They must also invite decoration workers to drop them.)
Draws detailed construction drawings with dimensions, such as decorative wall surfaces, furniture, etc. The completion of the above work is the beginning of the renovation!
Third, the budget
Based on what you know about the material price and construction details, make a more realistic estimate. Remember that you don’t forget about the loss in construction (usually around 5%)
1. Hydropower budget (water supply and drainage pipes and fittings, strong and weak wires, threaded pipes and fittings, hydropower installation costs)
2. Ground project budget (tiles, flooring, etc.)
3, ceiling project budget
4, wall project budget (wall paint, wallpaper, etc.)
5, wooden project budget (furniture, decorative surface, etc.)
6. Project budget of doors and windows
7. Other project budgets (installation costs for finished furniture or articles, cleaning costs, transportation costs, etc.)
Now that you know how much money you have to spend to reach the "my home" you want, you don't have enough money to make it! Oh, if enough, you can choose a good day, organize workers to start renovation!
Fourth, construction
Interior decoration works are usually divided into masonry, plumbers, bricklayers, carpenters, painters, cleaners, porters, professional product installers, etc.
To begin the renovation, follow the steps outlined below:
1, masonry, playing trunking: all pipelines trunking (water supply and drainage roads, strong and weak circuits), as well as the design requirements of the type of wall, such as the removal, opening holes. (usually 3 days)
2, plumbers, wiring: installation of circuits, waterways, air routes. (usually 4 to 7 days to complete), when taking the water and electricity, we must pay attention to what kind of floor you are laying, if it is to strengthen the floor, then do remember to clean the floor of the cement, the alignment of the pipe when the groove inside the dirty Clean up,, remember to test pressure after the water cloth is good,
3, mud (water) bricklayer, civil engineering and wall, floor tile surface decoration: landfill trunking, wall construction, repair of various world walls, floor brick wall tile. (usually 10 to 25 days to complete)
4, carpentry, decoration and security production: according to the design requirements of all the decorative surface (world wall surface) and furniture. (usually 15 to 30 days to complete)
5. Finishes for painters, furniture and walls: All wood furniture, decorative surface finishes, whitewashes for ceilings and walls (latex paint, wallpaper wall coverings). (usually 20 to 40 days to complete, especially when it is used as a wall paint, it has a lot to do with the weather)
6, plumbers, light fixture installation. (usually 3 to 4 days to complete)
7. Others: Installation of wood floor curtains, installation of self-purchased hardware pendants, and overall land reclamation and cleaning. (usually 3 to 4 days to complete)
8, this time you can buy some furniture (such as sofas, tables, etc.), and moved. . Over half of the month, you will check in. (If you use more environmentally friendly materials, after the completion of the renovation, do not have to specifically deal with the indoor pollution, ventilation on the line.)
The above steps have cross construction.
During the renovation process, you must keep in mind the original intention of your design, it is best not to easily change during the construction process, otherwise do nothing, you will be very dissatisfied, regret it!
Five, timber
To protect the environment and save money, you have to work hard on materials!
Use good materials? Oh, what's the point of evaluation? Is the material quality? Or safety and environmental protection? Or comprehensive cost-effective?
Well, there are too many kinds of materials used to decorate houses. As the saying goes: Only money is worth knowing! Oh, you buy expensive, the package is good. But the price/performance ratio is not very satisfactory.
In general, buying a mid-range product is better.
Wood: wood board with 100 ~ 140 yuan big core board; wood with bright color; panel with a natural board (usually the price at 50-60 on the same); less use of density board (higher formaldehyde content). . . . .
Stone categories: more use of marble less granite (Marble beautiful appearance, less radiation, but the hardness is relatively poor), of course, commonly used ladder step granite. Some cultural stones can also be used. (The bright and bright radiation of the stone is larger.)
Facing tiles: It is best to use several local brands. Only price highs. You can compare on your own (like antiques such as Marco Polo, L&D, Mona Lisa, Nobel, Dongpeng, etc.).
Wall paint: Dulux, Nippon, China Resources, Laiwu, masters. . . .
Furniture lacquer: Dabao, China Resources, Mei Tushi. . .
Cement: East Gate (Authentic), generally see the packaging, some say that the East Gate, a lot of bags are,,, not the original,,,
Wire: Use the best treasure, less than 160 rolls. Do not look carefully when you buy the wire. Look at the thickness of the wire and the packing of the wire. Packing tighter.
Water pipes can be used for Kinder's, Taurus's is also good, and Anno can also be used.
Decoration steps
Renovation steps: (Before the renovation you have to use a special book to record the whole process of renovation. Oh, you have to make this account.)