Acceptance must read all decoration room acceptance 5 steps

Compared with the rough room, the fully-decorated house not only allows the consumer to save the decoration trouble after the stay, but also can save expenses due to the scale effect. However, how to implement effective acceptance? The reporter interviewed Xu Guozhong, a supervisor of millions of homes, and Zhang Gong, a remodeling university, to hear what they said. The first step...80 couples wedding room petty bourgeoisie marriage room fashion fashion embodiment a member of the exclusive cash discount Mediterranean style blue + white mosaic even for home art young hot mom 50,000 to create two home 1 Shop Cash Discount Coupons · Floor heating This winter is not afraid of cold · Small apartment mix and match new trends · 200,000 luxury to create 95 flat space · Dulux paint cost-effective big PK · TV wall small space big content

Compared with the rough room, the fully-decorated house not only allows the consumer to save the decoration trouble after the stay, but also can save expenses due to the scale effect. However, how to implement effective acceptance? The reporter interviewed Xu Guozhong, a supervisor of millions of homes, and Zhang Gong, a remodeling university, to hear what they said.
The first step is to check the upper and lower water pipes of the kitchen and the bathroom to see if the drainage pipe drainage is smooth and whether the upper water pipe is leaking.
Xiao Yan: You can put the sink, basin, and bathtub full of water, and then discharge it, check the speed of drainage; check the toilet flushing water to be repeated several times;
The second step is to check the distribution lines and outlets.
Xiaoyan: The easiest way is to open all the light switches and see if the lights are all on. Bring a multimeter to check if each outlet has electricity;
The third step is to check the hollowing of the kitchen bathroom and other parts of the wall and floor tiles.
Xiao Yan: Use a small rubber mallet to randomly tap the tiles and floor tiles to listen to the sound. If the emptying rate exceeds 3%, there is a quality problem;
The fourth step is to inspect the woodworking products and paintwork products. Xiao Biao: Observe carefully whether the wood products are deformed, whether cracks at the joints are serious, whether the hardware is installed with a firm and straight edge, whether the paint is flowing, and whether the wall paint has a large-scale cracking phenomenon.
The fifth step is to check carefully some corners and hidden places. Xiao Yan: Pay attention to whether there is a weather strip at the entrance of the bathroom, whether there is rain flowing into the window, scratches on the panel of the switch socket, and whether the installation position of the bathroom hardware is reasonable.

Entrance decoration children's room decoration socket paint house decoration house switch decoration style kitchen wall tile fashion small apartment bathroom wall tile bathroom tile bathroom floor tile bathroom door kitchen tile decoration home

Clay Bar

Clay Bar,Clay Bar Kit,Detailing Clay,Clay Bar Your Car

Foshan SUMEITE Grinding Technology Co.,Ltd , https://www.aedetail.com