How long will it take for villa decoration to recommend several ways to improve the air in new homes?

How long will it take for the villa to be renovated? Most people will only have lived in a commercial house . So how long will it take for a villa to be renovated? Today saw a friend of this article is considered a very lucky today, oh say how long the villa decoration at the same time, also recommended several ways to improve the air of a new house, and I believe that will stay in the new house owners are of great help .

How long will the villa be renovated?

1, for everyone to popularize it! The period of house renovation should be 0.3 multiplied by the housing area. For example, if the area of ​​your villa is 500 square meters, the renovation time should be 500*0.3, which means 150 days, that is, the renovation period needs five months. .

2, some owners may ask, five months will not be too short, here must explain, we calculated the length of time does not include the villa designer early design, communication, choice of decoration companies and other matters. It's from the time of the renovation. It's half bag. In fact, the period of hydropower and shingle oil began to count, and it is the time for our basic construction to advance. In the later stage of soft-packing, you can choose the construction at the same time. After the construction, the furniture and electrical appliances can enter the market immediately.

3, if you encounter midway materials supply is not timely, may delay the decoration time, so the 500-flat house is best to prepare for the decoration of six months.

4. Under normal circumstances, the normal time for villa renovation is 6-8 months. If there are some very large all-inclusive villas, the duration may exceed one year. In addition to the basic renovation and decoration of villas, wood, oil, water and electricity, the villas also include civil works, product purchases, and equipment installations. All the staff involved in the renovation work must be very professional and not professional enough. The staffing configuration is very difficult to carry out smoothly.

Second, recommend several ways to improve the new home air:

1. Put a few pots of green plants in the room. It is recommended that you can place big leaf plants of green radish.

2. Electronic air purifiers can also be used to clean the air.

3, can be cut into small pieces of pineapple on the plate, and then into the room and furniture to absorb toxic gases.

4, in the room more candles to produce carbon dioxide, so that you can also integrate indoor gases, while speeding up the oxidation.

5. After 10 o'clock in the morning, divide the time of ventilation by 20 minutes every morning, evening and evening.

6, put more pots of water in the room, because formaldehyde is soluble in water.

7, can also use white vinegar fumigation of the entire room to achieve the role of formaldehyde.

8, place the activated carbon package, usually the amount of carbon package is about 20 square meters of the room 15-20 packages (50g/), drawers, cabinets placed according to the size of 1-2 bags on the line.

Summary: How long will the villa be renovated ? It depends on the size of the house. After the renovation is completed, the time for indoor drying and shelving has a certain relationship with the season. At the same time, the materials used for the renovation of new houses will also have a certain influence. In spring and summer, the air humidity is high, and the air flow is also relatively slow. Therefore, the new house is required to be air-conditioned for a longer time. The ventilation conditions in autumn and winter are better, and the drying time can be shortened appropriately. Normal drying can take two to three months to stay.

Door Hinges

Stainless Steel Door Hinges,Door Hinges with Ball Bearing, Stainless Steel Hinges, Square Edge Hinges, Radius Corner Hinges,Butt Hinges

Leader Hardware Manufacturer Limited , https://www.leaderhardwarecn.com