Renovations are as small as two or three months, and as many as nearly six months. As the owner’s busy work, it is impossible to focus on the construction site every day. However, some important nodes still have to be looked at. What points need to be paid attention to when decorating? This article from the acceptance of the new house to the completion acceptance, tells you some points that need to pay attention, as well as what materials are needed for the supervision, and hopes to actually help those who are confused. Some supervision notices for acceptance of new houses 1. Inspection wall Do not know when to start, see the wall turned out to be the primary issue of housing acceptance. I have seen a house and found that the windows had water seepage on rainy days. When they asked, they knew that the walls below almost every window in the entire building were seep. When it comes to a typhoon, it is even more alarming. Therefore, it is best to visit the house on the second day of heavy rain before the delivery of the house. If there is a problem with the wall at this time, it is almost insignificant. In addition to water seepage in the walls, there is another problem that is whether there are cracks. A friend once reported that there was a door-shaped crack in the wall of his home. Later, he asked the developer to know that the elevator had been left at the time of construction and was later used as a port to handle the lifts. At the same time, we must pay attention to whether or not the top of the wall is drilled. Some salesmen will tell you that they are embedded parts and deceive people. In fact, they should be leaking water in the upstairs. The way to discharge the water in the floor is the upstairs and the building. There is no good waterproofness. At the same time, use a ruler to pull down the four sides, so that you can know whether the room is inclined, because if the oblique room is likely to have different gaps in the decoration and placement of furniture. 2. Verifying hydropower Check whether the house's hydropower is on. Of course, for some high-end renovations, most of the water pipes and wires will be replaced in the later period. Therefore, sometimes these contents are not critical, but if you do not plan to replace the water pipes and wires, then these things must be carefully accepted. In addition to checking whether or not electricity is available, the inspection line is mainly to see if the wire meets the national standard and whether the cross-sectional area of ​​the wire meets the requirements. In general, the home electric wire should not be lower than 2.5mm2, the air conditioning line should reach 4mm2 otherwise, when using the air conditioner, it is easy to overheat and soften. 3 waterproof The waterproof mentioned here refers to the waterproof of the kitchen and toilet. Of course, some of the houses that are currently delivered have already declared that they have not done any water repellent treatment. This will require renovations. If waterproofing is already done at the time of delivery, then you need to verify the waterproof quality. If you do not try before the renovation, leaks will be found after your decoration, then the maintenance project will be big. You have to dismantle the newly renovated floor to make a new waterproof layer. The method of acceptance of waterproofing is: use cement mortar to make a door to the kitchen and bathroom, use a plastic bag to cover the drain or drain, and put it in a solid state. Then put water on the kitchen and bathroom floor. About 2cm high). Make an appointment with the owners downstairs to see if there is any seepage in the ceilings of their home kitchens and bathrooms after 24 hours. 4. Inspection pipeline The pipe referred to here is a drainage or sewage pipe, especially a sewage outlet at a balcony or the like. When accepting, take a water-filled appliance and pour water into the drain to see if the water is flowing smoothly. Why should we accept this? Because during construction, some workers often throw some cement residue into the drain when they are clean. If the cement is more viscous, it will block at the elbow and cause drainage difficulties. Another situation is to see if there is a water storage deodorant elbow. According to experience, if the sewage pipe does not contain water and deodorant elbow, then the overall quality of the house will be compromised. Why does the sewage pipe need such an elbow? Because the elbow will store water, so that the odor from the lower pipeline will be blocked under the aquifer; without the elbow, the outlet of the laundry room and the toilet will be emitted Unbearable odor. There may be developers who think that the use of deodorant floor drains will be sufficient, and engineering practices have proven that deodorant floor drains are far from meeting actual needs. This small place often best reflects the construction quality of builders. Water and electricity acceptance Clay project acceptance Woodworking acceptance Paint construction acceptance New housing acceptance Notes Construction Acceptance Tile Ceramic Tiles Kitchen Tiles Balcony Tiles ld Tiles Floor Tiles
Are you having the trouble of cooling the wind turbines? Fluoride solvent not only provides excellent performance in many heat transfer applications, but also has no negative impact on personal safety and environmental sustainability. Fluorocarbon refrigerants are non-flammable insulating liquids with wide operating temperature range and easy maintenance. They are substitutes for traditional cooling liquids such as water, ethylene glycol or oil. The fluoride can also be applied to heat dissipation of wind turbines. If you need to find a better way to heat up, please email us for help.
Refrigerant For Wind Turbines Generator Eco Friendly Refrigerants,Perfluorinated Liquid For Generator,Refrigerant For Wind Turbines Generator,Low Toxicity Fluoride Solvent Guangdong Giant Fluorine Energy Saving Technology Co.,Ltd , https://www.tuwtech.com
Supervision experience: what must-sees in decoration acceptance?
1 23 Next> Total 3 Pages
Page to page