Most of the old offices have been residing for three or five years or even more than ten years. Whether there are problems with quality or whether they have been overhauled is a problem that must be made clear before the renovation. Except for some invisible hidden projects, we must review and make judgments. In addition, some seemingly new parts must pay special attention to, such as the newly-painted walls or roofs, which can be used to hide the cracks on the walls of the houses or the water seepage on the ceilings. So how does the office wall renovation work? What are the old office decoration techniques? Let's take a look with Xiaobian! Office wall renovation how to do the old office decoration skills First, the aging water pipe must be replaced The old dryland pipelines of the old offices often have many unreasonable plans. During the renovation, the original dry roads must be thoroughly reviewed to see if they can rust and age. If the original pipeline uses a galvanized pipe that has been eliminated, it must be replaced by a copper pipe, an aluminum-plastic composite pipe or a PP-R pipe during construction. For example, before decorating the bathroom, it is necessary to first stop the floor drain, place water with a depth of about 5 cm to carry out experiments, and if it leaks, it is necessary to redo the waterproof task. At the same time, it should be noted that no corners of death can be left after construction. Second, the circuit is not innovative In old offices, there are widespread scenes such as simple circuit deployment, aging wires, and illegal cabling, which can no longer meet the needs of modern offices for electricity use. Therefore, renovations must be carried out in order to renovate new wiring. If the original line used in the invention is an aluminum wire, it must be replaced by a 2.5 mm square section of copper wire. As for the circuit of high-power electrical appliances such as air conditioners, a 4 mm square section line should be set up on its own, and a PVC insulated conduit line must be used for embedding. In addition, according to the new national normative rule, the number of fixed outlets in civil offices should not be less than 12. However, there are still many existing outlets in old offices that do not meet this specification. If a small amount of mobile sockets are used, current load When it is enlarged, the mobile socket will have a strange low temperature due to poor contact, which will cause hidden dangers for electric shock and electric fire accidents. Third, "hidden project" to open again At present, the quality of office decoration is largely caused by improper construction of “hidden projectsâ€. What is "hidden project"? In the construction process sequence, the task of the last process will be covered by the next section that can not be reviewed, and it is called the “hidden projectâ€. Therefore, in the renovation of old offices, we must pay special attention to "hidden projects." For example, whether the pipelines, lines, and equipment of various equipment such as water supply, air-conditioning, and ventilation in ceilings have been subjected to closed experiments and electrical insulation and resistance tests, whether the connection can be stabilized, whether the joint practices can meet the requirements, and whether flammable materials can meet the requirements. All fire prevention and flame retardant solutions have been made to belong to the scale of “hidden projects†and they cannot be reviewed after the first installation. Industry insiders suggested that when these old buildings are renovated, it is a good time to clear these areas from the new ones. The owners must review them rigorously and remove the “hidden projects†left over from the past. Fourth, "three-sided" innovation is essential During the renovation, renovation of the old office walls, sky, and ceiling was the most easily neglected. Experts suggested that professionals should be invited to conduct on-site explorations of the houses to see if there are any obvious cracks, whether they are flat, whether they fall off, and if sand. If these conditions exist, repairs must be carried out, including the eradication of oily, pulverized wall lacquer on the wall surface, and the use of cement mortar to repair the base layer, cracks, and holes. In addition, after the repair, a primer should be applied to conceal the effect, so as to stabilize the grass-roots level, and second, to prevent changes in the grass-roots base due to pan-alkali and moisture, and then use a proportioned emulsion paint for decoration. During the construction, attention should be paid to the cleanness of the air at the scene, and good protection against dust should be provided. The tool should be protected from any sundries. V. Renovation of doors and windows Aging doors and windows is also a prominent issue in the old office. However, if the material is solid and you like it, it is only necessary to renovate the paint. If the following problems arise, you must remove the redo. Important The question depends on whether the wooden doors and windows can be crushed and deformed. If yes, the changes in the characteristics of the wood itself will be explained, and it is certain that new changes will be made. In addition, steel doors and windows outside the paint film, the main body rust or cracking, in addition to unsafe, it is difficult to restore the original state, in order to not affect the consequences of the application, experts also should be removed to redo the initiative. Sixth, the old office must be completely disinfected Prior to renovating an old office, a 24-hour to 48-hour water storage leak test should be conducted on the bathroom and kitchen to review how the original waterproofing project was done. If there is no water leakage, it is confirmed that the waterproof solution is done well; if water leakage occurs, The scene must be made from the new waterproof solution. After the waterproof solution is finished, wait for the air to dry completely, then lay the tiles and perform the overall renovation. Moreover, in the bathroom will be changed to sit and be sure to do a good job of waterproofing the position of the toilet seat, in the design and decoration of the top of the bathroom, should pay attention to inconvenient disassembly, which will facilitate the future review and training. Seven, pay attention to three points when retiring old tiles 1. When smashing wall bricks and air bricks, avoid debris intrusion on the waterways; 2. To solve the problem of waterproofing, use as little elbow as possible on the dry road to avoid poor water flow or infarct; 3. Minimize the use of wood plates. Most wooden products contain formaldehyde, which affects the debilitating effect. In addition, the wood will be deformed due to meteorological moisture, and the manual cost of wood products is also higher. The above information on the renovation of office walls is briefly introduced here. I hope the above information will help everyone. If there is anything we do not know where to leave comments on the bottom of the page, we will answer your questions as soon as possible. Thank you for your support of this site. Follow-up articles have been published. Please continue to pay attention. Office office decoration renderings Suzhou Newstar Hardware Co.,Ltd is a professional Hand Tool bag manufacture located in Jiangsu Province China, including tool duffel bag, mechanic tools bag, Tool Bag set, etc. We could offer customers different kinds of tools bags with customized needs, such as material, size, type, pockets, handles, small inner pockets, name card, logo, etc. And also we are specialized in tools which could be put in tool bag, different combinations of Hand Tools, power tools and Garden Tools. Hand Tool Bag,Tool Duffel Bag,Mechanic Tool Bag,Tool Bag Set SUZHOU NEWSTAR HARDWARE CO.,LTD. , https://www.sjnewstarhardware.com
Office wall renovation how to do the old office decoration skills