Spring is the season for home improvement, but the southern part of spring has more rainy weather and humid air. This kind of wet weather inevitably has a certain impact on the renovation and construction at this time, especially when decoration materials are most likely to get wet. Once these problems occur, what are our first aid measures? Follow Xiaobian together to learn about the coup in building materials. First, wet building materials first aid four wonderful recipe It is not too late to make up for the so-called dead sheep. If home improvement building materials are inevitably affected by the spring weather, the following four small methods can solve your immediate needs: Plaster control setting time When dealing with gypsum-like material in the spring, because of the moisture, it is always difficult to control the shape of the molding, and the pressure resistance is also reduced. To improve this problem, the only way is to strictly control the condensation time, not as usual. Allow stirring time. Nitro paint changed to polyester paint In general, it is not advisable to carry out paint construction in humid air, especially in the South, difficult to do and easy to follow-up repair problems. In order to solve this problem, you can carefully look at the type of paint, as much as possible to use nitro Paint, not to choose polyester paint, etc., Nitro paint drying time will be faster. Air conditioning absorbs moisture On the one hand, the air in the spring is relatively humid. On the other hand, the construction site must always maintain a window-opening and ventilation environment. It is impossible to prevent moisture from entering the room. At this time, an air conditioner can be added to the decoration site to use the air-conditioning function. Absorb excess moisture from the air and avoid moisture penetration. Drying of wood Wet weather panels should be changed to flat, and immediately after entering the field, a layer of closed lacquer should be brushed to reduce the water absorption of the fine pores of the panels; the finished furniture can be provided with a moisture-proof protective film on the surface; In the case of ceilings, the use of wood keels is not recommended, and light steel keels are preferred. Spring decoration knowledge building materials purchase building materials maintenance building materials knowledge
This product is suitable for concrete construction of ultra-high pier and house-building structure.
Project Achievements: Chengzhong Building; Zhaolu Expressway; Tianxingzhou Bridge.
Surface Treatment: painted or as customer requirement
Application: Bridge,House-building project
Type: Hydraulic climbing Formwork
Tolerance: GB or as customer requirements
Size: Customized
MOQ: 1 set
Climbing Formwork,Steel Climbing Formwork,Concrete Climbing Formwork,Multi-Level Climbing Formwork Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com
Spring home improvement moisture is the key to trick building materials to moisture
1 2 Next> Total 2 Page
Page to page