According to the different materials used in the ceiling construction process, the construction process is also different. What are the technical requirements for the new type of simple and simple aluminum gusset ceiling during the construction process? Today, let Xiaobian explain the specific knowledge of the aluminum slab ceiling construction process for you! 1. Elastic line: According to the level of the floor elevation, according to the design elevation, the horizontal line of the ceiling is raised along the wall, and the center point of the room is found, and along the level of the ceiling, the keel is drawn on the wall centering on the center of the room. Position line. 2. Install the main keel boom: After playing the top level of the ceiling and the position of the keel, determine the elevation of the lower end of the boom, install the pre-machined boom, and install the boom with the expansion bolts on the ceiling. The boom is made of Pa round steel and the distance between the slings is controlled within 1200mm. 3, the installation of the main keel: the main keel generally uses C38 light steel keel, the spacing is controlled within 1200mm. The installation is carried out with a hanger attached to the main keel and a boom. 4, installation side keel: according to the requirements of the ceiling height of the ceiling with cement nails to fix 25 × 25mm paint keel, cement nail spacing is not more than 300mm. 5. Install the secondary keel: According to the size of the aluminum gusset plate, install the secondary keel that is matched with the plate, and the secondary keel is hung on the main keel by hanging pieces. When the length of the secondary keel needs to be extended, the secondary keel connector is used to connect the opposite ends while hoisting the secondary keel, and then straightening and fixing. 6. Install the metal plate: When installing the aluminum gusset, pull a reference line in the direction of the vertical keel in the middle of the assembly area, and align the reference line to both sides. When installing, gently handle it, you must press the sides of the square plate gently in the order of the flanging area, and then push it into the keel and then push it. 7. Cleaning: After the aluminum gusset plate is installed, it is necessary to wipe all the surface of the board with cloth, and there must be no dirt or fingerprints. In short, the construction process of the aluminum gusset ceiling mainly has the following major steps, similar to the ceiling construction process of other materials, but there are still some differences in details, and the construction process quality requirements are also very high, generally require professional construction. Personnel carry out construction to ensure that it is not prone to unevenness, cracking, arching, etc. after installation. Concerned about surprises Label: Aluminum gusset ceiling construction process Previous: Analysis of the difference between floor heating and ordinary convection heating method Next: What are the art glass porch suitable for the pattern?
THIS OUR NEW Model, Excellent design with High quality, Free your space and Flexible use.
Sofa Set,Modern Single Sofa,Hotel Sofa 3 Seater,Apartment Single Sofa FOSHAN CITY LESHUN RONGHUI FURNITURE CO.LTD , https://www.ronghuifurniture.com
Aluminum gusset ceiling construction process