The winter has already approached us, soaking in a comfortable hot bath will keep us warm and drive away the cold. The comfortable hot bath, the bathtub is especially important for us, but there are quite a few precautions for the installation and maintenance of the bathtub. The following small series introduces you to the installation essentials and precautions of the bathtub, and those who need it should pay attention! Before installing the bathtub, the bathtub should be cleaned. Remove the screws from the legs with the legs first, insert the slightly inserted mother into the bottom of the tub, buckle the legs on the tub, bring the nuts, and tighten the leveling. When the bathtub is brick-laying, the brick legs should be built, the cement mortar should be smeared, and the bathtub should be placed on the brick platform to find the level; if the bathtub and the brick table do not match, the cement mortar can be used to fill the surface. When the bathtub is installed in the water, put the water supply tee nut on the horizontal cross tube, wrap the asbestos rope, insert the middle of the tee, tighten the nut, install the copper tube into the lower water pipe mouth, and bend the lower end of the copper pipe. Put the rubber pad under the bottom of the tub, apply the putty, insert the water hole into the tub, put on the rubber pad and the eye ring outside, and apply the lead oil, wrap and ash on the thread. Use a fork to catch the cross ribs in the drain and the water in the elbow. Put the overflow riser on the nut, wrap the oil pan rope, insert the upper mouth of the tee, align the overflow hole of the tub, tighten the nut, add 1mm thick rubber pad to the elbow of the overflow pipe, apply the putty, and wear the bolt Over the long pipe, the "one" thread on the water elbow is not loose. The place where the tub is connected to the water pipe and the down pipe is wrapped around the oil asbestos rope, compacted, and then sealed with putty. When installing on the water, if the bathtub is equipped with a long neck faucet, such as a cold hot water nozzle on the wall, first straighten the upper water pipe with a short pipe, measure the short section size, saw the pipe thread, and put a smear on the twine. , screw into the nozzle, tighten and straighten, remove the hemp. For example, when installing the water mixing nozzle with a shower, remove the cold and hot water pipe plugs, put a short pipe with a threaded thread into the pipe mouth, level the alignment, and screw the mixing water inlet to the lead oil. Insert the key into the inlet, put it into the cold and hot water nozzle, check the size, protect the mouth against the wall, then align the mixing nozzle, tighten the nut, level the alignment, make the mark after the fit, and mix the water gate Remove, re-smear the oil and wrap it and install it. The notes are as follows: 1. When installing the skirt bathtub, the bottom of the skirt should be close to the ground. The floor should be reserved for 250~300mm holes in the drainage area, which is convenient for drainage installation. The inspection hole is installed in the wall of the bathtub drainage end. 2, other types of bathtub can determine the height of the plane on the bathtub according to the relevant standards or user needs. Then install two bathtubs and install the bathtub. If the side of the bathtub is built on the side of the bathtub, a manhole should be provided at the drain of the bathtub or a manhole should be provided on the wall at the end of the drain. 3, the height of various bathtub cold, hot water taps or mixing faucets should be 150mm above the plane on the bathtub. The chrome plating should not be damaged during installation. The chrome cover should be in close contact with the wall. 4. The height of the fixed shower and hose shower can be installed according to relevant standards or according to user requirements. 5. The upper surface of the bathtub must be leveled with a horizontal ruler and must not be inclined. Apply a sealing paste to the side of the upper side of the bathtub and the wall. 6, the bathtub drain and drain pipe connection should be firm and compact, and easy to disassemble, the joint should not be open. 7. Do not damage the waterproof layer. If it has been damaged or has no waterproof layer, it must be waterproofed first and tested by water leakage for 12 hours. 8, fixed firmly, pipe interface is tight. 9, pay attention to the protection of finished products to prevent bumps.
Tempered or toughened glass is a type of safety glass processed by controlled thermal or chemical treatments to increase its strength compared with normal glass. Tempering puts the outer surfaces into compression and the interior into tension. Such stresses cause the glass, when broken, to crumble into small granular chunks instead of splintering into jagged shards as plate glass (a.k.a. annealed glass) does. The granular chunks are less likely to cause injury. Toughened glass is a kind of safety glass.
Toughened glass can be made on customer's request, clear toughened glass, ultra clear toughened glass, colored tinted toughened glass, printed toughened glass, back painted toughened glass, frosted toughened glass, toughened Laminated Glass, toughened Insulated Glass, toughened Vacuum Insulated Glass and so on.
Toughened glass can be used for furniture, buildings, doors, windows, walls, table tops, fence, partitions, railings, balcony, balustrade, shower room and so on.
toughened glass, clear toughened glass, color tinted toughened glass, ultra clear toughened glass, back painted toughened glass, silk printed toughened glass Shanghai Lead Glass Co.,Ltd , https://www.leadglazing.com
Bathtub installation precautions make the winter no longer close