Spring is a good season for decoration, but the northern spring is a contradictory season. When there is no rain, it is dry and windy, and sandstorms sometimes occur. However, if it enters the rainy season, the materials for decoration will easily become wet. In the spring decoration, if it is not properly handled, it will be easy to see “disfigurement” such as wall cracks, furniture cracking, and floor warping deformation.


St. Debao Ceramics Gold Asian Ceramics

Protect "face"

Pre-construction

When buying wood, you must go to a large wholesaler and not a street shop. Because the timber of large wholesalers is usually dried in the production area and then transported in containers, the wholesaler takes delivery directly from the container and then transports it to the home of the decoration owner. The reduction of intermediate links has correspondingly reduced the chance of wood dampening. In addition, after the timber is bought back, it should be put in the house for two or three days. After adapting to the gas phase, the construction process will be carried out again. Before construction, the ground should be kept dry and covered with a moisture barrier. In this way, the wood will basically no longer have the problem of deformation.

In addition to paying special attention to material selection, preparations for moisture protection should also be made during handling and construction. When transporting materials, it is best to choose when the weather is fine. If it is rainy, it should be protected with a plastic film. If the material is already damp, it should not be used again. Avoid using it after drying. When using plates, use wood to pad, not directly on the ground, and more can not be placed in the kitchen, health, balcony and other places easy to tide.

Site construction:

1. On-site construction, doorboards and cabinets used at the base of the plates and solid wood lines must pay attention to dipping paint to prevent cracking deformation. If the veneer panel is used as the surface material, the surface shall be sealed with varnish in time so as to avoid cracks and fine cracks on the veneer surface. Because now veneer board surface processing technology can do a few ten millimeters, too late seal varnish prone to cracking.

2, if the spring paint construction, it should be noted that dust intrusion into the interior caused the paint to be contaminated. When the wooden paint is applied, because the wood paint dries slowly, and the paint absorbs the moisture in the air, it will produce a layer of matte. Therefore, the drying agent is generally used to make the paint dry quickly. Be careful not to let the paint surface be too thick. If the paint surface is too thick, the paint will crack due to uneven heat and heat in the table. When making the door, ensure the distance between the door and the ground to prevent the door from snagging the ground moisture.

3, if it is a multi-year project, the spring decoration should also pay attention to open the window can not be opened when the north-south ventilation is too large, otherwise the wind is larger, convection while the air is fresh, but due to ceiling, wood, wall outside the internal moisture content Different, so the internal and external rate of change is inconsistent, the same crack will appear. Observe the observation that it will be common for the top surface and walls to crack due to rapid ventilation during this period. As long as each window is opened so as not to be too ventilated, at the same time to ensure a certain temperature within the room can solve the above problem.

4, the spring tile paving and staggering the completion of the same problem of conservation, the smaller the brick, the more attention should be paid to conservation. Maintenance is generally performed every other day after paving. The method is very simple. Use a clean wet towel to gently rub the bricks to keep the bricks wet. This is due to the small brick seam itself contains a small amount of seaming agent, maintenance is not in place or not timely, it is prone to cracking of the floor tile grout, cracking off the walls of the grout section, and even pulverization.

5. During the construction of the wall paint, the base moisture-proof primer cannot be saved. Pay attention to the ventilation after the brushing and strive for the maximum degree of drying. In addition, you can choose to paste the lining cloth in the wall base treatment to ensure that the wall will not crack. Latex paint is not easy to dry, and will not be able to mold and taste bad, which requires the construction of open air conditioning after the dehumidification, completely remove the moisture in the air.

6, when laying wood floors, it is best to do waterproof moisture treatment. The normal procedure is to use pearl cotton or asphalt to make a base. Then, the floor should be installed with expansion joints. In this way, the floor will not be warped, nor will it be black and moldy due to the tide. At the same time pay attention to keep the room air dry.

Repair face:

Wall paint cracking solution: scrape or polish the surface of the substrate to remove the wrinkled coating. If you apply a primer, make sure the primer is completely dry before applying the top coat. When brushing again (to avoid extreme temperatures and humidity), apply a uniform layer of high-quality interior paint.

Furniture paint cracking solution:

Remedies for clear oil. If you use ordinary paint, you need to carefully polish the crack with fine sandpaper, then brush the same color paint twice;

If you use a water-based paint, use a special repair wax and apply it carefully.

Remedial measures for mixing oils. Need to carefully grind the cracking surface, serious also need to be coated with putty, and then spray paint.

Wood floor deformation, dry cracks, walking noise and other issues Solution: The problem can not be serious with the method of drag and drop, 3 times a day 15 days -30 days will be better. The only serious problem is to dismantle the raised floor and reposition the expansion joints for repairs.

Sign in to send a decoration package

Wall construction Three trees Paint porch Decorating lacquer Interior Decorating windows Furniture coatings Floor tiles Tile adhesive Floor tiles Balcony tiles Ld tiles

SMD LED 0602

SHENZHEN YGHQ Optoelectronics Co.,ltd. , https://www.leds-smd.com