In solving the decoration acceptance, the acceptance of the "hidden project" is the most headache for the owners. The so-called concealed project, as its name suggests, is the "not seen light", hidden in the interior of the circuit and structural engineering. "Hidden project" is difficult to observe and accept with the naked eye, and some decoration companies or construction teams that have interests in it can do more on this! In places where the owners did not expect them to “stealâ€, the materials lacked two or less materials, or even rough work. They did not carry out construction in accordance with the relevant regulations, leading to a lot of hidden problems in home decoration and the quality of home improvement could not reach the standards. At the final acceptance, the owner must make his eyes wide open, check from the corners of the corner, and pick up the hidden problems, “preventing things†to prevent future problems. The following is one of the details that need to pay attention to the acceptance of the home improvement summary that the editor has compiled for you. At present, the "concealed project" violation is more prominent phenomenon is the damage caused by pipeline leakage! Because the installation of pipelines is not easy to check, after construction of all the pipelines, construction workers have not passed the water injection and pressurization according to the relevant regulations, and check whether there are any running, running, drip, leak, etc., and they directly hand over the work. Consumers are hard to find with the naked eye. If problems are found, the consequences are serious. In home renovation, some irresponsible decoration companies are still recommending the use of "galvanized pipes" to consumers. In all new towns and cities in China, the use of cold galvanized pipes as water supply pipes is prohibited. It can be said that galvanized pipes have basically exited. The market stage of a residential water supply pipeline. A good fit-out company will take responsibility for customers and recommend PPR pipes, plastic-lined pipes or even better copper water pipes to consumers. Copper pipes inhibit bacterial growth and keep drinking water clean and hygienic. In addition, the copper pipes also have the features of high strength, strong reproducibility, and high cost performance. It is a kind of water pipe material that meets the trend of environmental protection. In Western developed countries, the use of copper pipes is extensive, and 80% of water supply pipes use copper pipes. In some major cities such as Shanghai, the use of copper pipes is getting higher and higher. Water pipe inspection needs to pay attention to the place: 1, water pipes: galvanized pipe teeth less than 8 teeth, raw material with more than 6 winding wrapped tightly, not rotten teeth. Plastic pipe or aluminum plastic pipe Note that the installation of special tools, in strict accordance with the provisions of the operation, the final pressure test (pressure test is greater than 24 hours). 2. Pay attention to the discharge of water pipes from the wall. Do not leave the floor, under the floor tiles, or at high altitude. If you must go to the floor and floor tiles, the installation of the water pipes must be straight and no joints are allowed. The valves should be installed on the ground. The water inlet pipes of the buckets should be equipped with triangular valves. 3, electrical circuit emissions, in addition to hollow floor, but also to wear the pipe, such as the use of PVC pipe, the wall thickness of not less than 1.2mm. The electric circuit discharges the wall body and does not go under the floor or the floor tile. 4, gas (natural gas) to use the bright tube, control slope, joints to use thick white linen paint, do not use raw materials, but also to test gas. 5. In the end, don’t forget to let the construction team leave the wiring diagrams, especially the dark lines. Be sure to leave accurate electrical wiring diagrams in case you need urgent repairs. In addition, when the water pipe is accepted, it is necessary to check the pressure of the water pipe after the worker is installed to confirm that no abnormality has occurred. Pay attention to whether the installation is stable and firm, whether there is a phenomenon of water leakage, the center distance of the water heater and other cold and hot water interfaces, and whether the height is within the allowable error or not. Of course, it is also important to use a certain amount of quantity. This is also a place where some decoration and construction teams that are greedy for profit are most fond of them and are easy to make tricks. They replace the good materials of the owners with poor quality materials. Carefully pay attention to the brands on the pipelines and fittings during acceptance. The sign is whether it is the brand it bought to prevent it from being "stuck". Hidden Projects Home Improvement Home Appliances Residential Paint Decoration Find Decoration Company Okay Tile Flooring Home Furnishing North American Standard Light,American Standard Outdoor Lights,American Standard Lamps,North American Standard Lamps Ningbo Royalux Lighting Co., Ltd. , https://www.royaluxled.com
"Dark arrows hard to prevent" decoration acceptance details of pipe acceptance