Zhongwang CAD Longteng stamping die makes the mold easier to make

In the previous two CAD technical articles, I combined my actual use of the Zhongwang CAD Longteng stamping die, and shared with you the two practical functions of the automatic drawing and automatic marking style of the Zhongwang CAD professional mold design software . Through these functions, our designers can effectively simplify some manual operations when designing CAD, so that the design work can be completed more efficiently. In this article, I will introduce you to another very useful feature of Zhongwang CAD Longteng Stamping Die – automatically generate schedules.

Whether it is mechanical manufacturing or mold processing, the schedule (also known as the "BOM sheet") is an important part of the CAD design drawings. It is the key document to guide the procurement and manufacturing of the logistics department and the production department. In general, the schedule in the mold drawing contains information on the type, serial number, part name, material, standard code, specification, and quantity of all parts in the drawing.

We know that mold design can be generally divided into 2D CAD design and 3D solid design. But no matter which design method, the schedule is an indispensable part. As far as I know, many companies currently use two-dimensional design manual methods for the production of schedules. I believe that CAD designers are very clear that there are many drawbacks to this manual compilation:

(1) The name of the mold part is disordered. Different designers have different names for the same parts, which often causes confusion in the later stages of production.

(2) The error rate is high. Due to the large number of parts in the schedule, the slight inattention of the orderer can result in the number of parts being easily entered into errors or even dropped parts.

(3) The workload is large and the design efficiency is low. In a complete set of mold drawings, there are dozens of parts and hundreds of parts. If the parameters of each part require the designer to enter one by one, the amount of labor is huge, and it takes a lot of time, affecting the design efficiency and process.

As a professional CAD designer, we urgently need to improve the method of this backward hand-made schedule to achieve automatic generation! I learned from the customers of Zhongwang CAD that this Zhongwang CAD Longteng stamping die can solve this problem. I personally found that the Zhongwang CAD Longteng stamping die has basically realized the automatic parameter generation of the mold and the automatic generation of the schedule.

The following is a part drawing (Figure 1) that I used to draw the CAD Longteng stamping die, and directly use the software 's template list function to produce a one-time production schedule (Figure 2), which is very convenient and standardized.


Figure 1: Part drawing using Zhongwang CAD



Figure 2: Schedule automatically generated by Zhongwang CAD Longteng stamping die

The use of Zhongwang CAD Longteng stamping die to automatically generate schedules can effectively avoid many problems caused by manual compilation. The names of each part are unified, which is beneficial to the management of enterprise information annotation, and can improve design efficiency and shorten mold processing cycle. Relevant data indicates that about 60% of the abnormal problems that occur in the production process are caused by errors in the schedule. Therefore, for designers and enterprises, the automatic production function of the watch of the Zhongwang CAD Longteng stamping die has positive significance.

The above is the experience and feeling of using the CAD Longteng stamping die for more than a month. Due to the limited level of personal professionalism, the practical functions of the Zhongwang CAD Longteng stamping die were not well introduced. Interested friends can go to http:// to download more and more detailed practical design features of the CAD Longteng stamping die.