Performance fountain is a form of our fountain, which can show a magical scene through design, technology, light and water mist.It always very interesting.Our team has creative design, rich work experience and cost-effective solutions.We are very willing to provide our professional services to any friends in need.
Performance Fountain,Fountain Musical,Fountain Dancing,Water Fountain Dance Wuxi Jinshanghua Environmental Equipment Co., Ltd , https://www.jshfountain.com
A person from the Energy Conservation Department of the Ningxia Economic and Trade Commission was uneasy.
The National Energy Conservation Assessment Team, composed of the National Development and Reform Commission, the Energy Bureau, and the Ministry of Industry and Information Technology, is currently conducting assessments on the energy saving situation of each province and city in 2009, and listening to the assessment reports on the energy saving situation of the “Eleventh Five-Year Planâ€. Last Friday (March 26), the assessment team ended the assessment of Ningxia's energy-saving site in 2009 and began to turn to other provinces and cities for assessment. "They didn't tell us how many points they played in 2009. The specific assessment results may have to wait until October," said the Energy Savings Department.
The material reported by Ningxia is that in 2009, the actual energy consumption per 10,000 yuan of GDP decreased by 6.04% compared with 2008, and 2.04 percentage points more than the planned target. As of 2009, the energy consumption per 10,000 yuan of GDP in the district has decreased by 16.36% compared with that in 2005, and 80.06% of the total target of the 11th Five-Year Plan has been completed, and the energy saving progress target has been completed. But at the end of this year, whether it can complete the "Eleventh Five-Year" 20% energy-saving index, Ningxia still has no bottom.
The mood of this person is actually a microcosm of the strengthening of the energy conservation work of the country this year, which in turn led to the strengthening of the "Eleventh Five-Year Plan".
According to figures released by the National Bureau of Statistics, as of 2009, the national energy consumption per unit of GDP (GDP) decreased by 14.38%, less than 80% of the expected target. According to the 11th Five-Year Plan, at the end of 2010, the national energy consumption per unit of GDP fell by 20% from the end of 2005.
The reason for the pressure on all localities is that with the recent increase in the operating rate of high-energy-consuming factories, the energy consumption rate has begun to rise faster than the industrial growth rate, and some regions have experienced an increase in GDP energy consumption.
Several provincial and municipal statistical bureaus and the Energy Department of the Economic and Trade Commission told reporters that the report on stopping some high-energy-consuming manufacturers has been reported to the provincial government. "Our suggestion is that we must stop production of some manufacturers at any cost. Otherwise, the 'Eleventh Five-Year' energy-saving target will not be completed, and the governor will be punished. Next year, the National Development and Reform Commission will impose restrictions on the project." A person told reporters.
This argument is not without reason. According to the current energy conservation situation, only a very small number of provinces have completed the “Eleventh Five-Year†energy-saving indicators ahead of time. If high-energy development continues to accelerate, many places, even the whole country, will not be able to complete. The possibility of the 11th Five-Year Plan for energy efficiency is not non-existent. "So there is a lot of uncertainty in the completion of energy-saving this year." He told reporters on the eve of the local assessment of energy-saving work.
Only Beijing dares to complete the task According to the preliminary statistics of the National Bureau of Statistics, in 2009, only Beijing and Tianjin completed the “Eleventh Five-Year Plan†annual energy consumption reduction of 20%.
Among them, the energy consumption per unit of GDP in Tianjin fell by 6.05% last year, and it fell by 20.1% in four years. However, Tianjin still dare not take the "Eleventh Five-Year" energy-saving goal lightly.
Wu Junding, deputy director of the Tianjin Municipal Bureau of Statistics, told reporters that Tianjin can guarantee that the energy consumption per unit of GDP will not rise or decline slightly this year. If the energy consumption per unit of GDP in 2010 is 1% higher than last year, the energy consumption of the first four years will be I will give up my previous efforts, because in the end, I have not completed the “Eleventh Five-Year†energy-saving task in five years.
He stressed that the proportion of Beijing's tertiary industry has reached more than 70%, but Tianjin is currently less than 50%. The industrial structure determines that it is very difficult to save energy this year, which is different from last year. "So Tianjin's energy saving can't compare with Beijing," he said.
Last year, Tianjin vigorously developed high-value-added industries for aerospace, including helicopters, rockets, and A380s. The energy consumption per unit of GDP fell rapidly. But this year is the recovery of many high-energy-consuming manufacturers, including steel, cement, and colored. Although some manufacturers have transferred to Hebei production, but GDP and energy consumption are still considered Tianjin, so this year's energy-saving task is still arduous.
Other provinces that did not complete the “Eleventh Five-Year†energy-saving tasks ahead of schedule, but the actual progress exceeded 80%, are also quite worried about whether this year's energy-saving tasks can be completed.
A person from the Central and Western Province told reporters that at present, even the progress of energy saving over 80% is not open to publicity, because in the past few years, provinces in the northeast have publicly stated that energy conservation has been completed well, but the figures have not been approved. As a result, the governor went to the National Bureau of Statistics. Have done a review. "The figures are mastered by the Bureau of Statistics and the National Development and Reform Commission. If the completion is not good, the National Development and Reform Commission will impose restrictions on the implementation of the project. Everyone is afraid of it," he said.
According to the report released by the National Development and Reform Commission, as of 2008, 11 provinces (autonomous regions and municipalities) including Beijing, Tianjin, Hunan, Shaanxi and Jiangsu have completed more than 60% of the “Eleventh Five-Year†energy conservation goals. The reporter learned that as of 2009, the “Eleventh Five-Year†energy conservation work exceeded 80% in the provinces, including Beijing, Tianjin, Hunan, Shaanxi, Ningxia, Guangdong, Yunnan, and Jiangsu.
Local production stops at any cost However, even if there are so many provincial and municipal energy-saving progresses of more than 80%, but by 2010, the situation will change greatly, and local governments may take extreme measures to increase energy conservation efforts.
Ningxia is currently preparing a policy to implement the standardization of energy conservation work for products, so as to have more detailed energy-saving guidance on the basis of national restructuring and elimination of backward production capacity. CNMn.
Another person from the central and western provinces and cities told reporters that the current energy-saving department has recommended that the provincial government close some high-energy-consuming manufacturers' production lines when necessary, especially the steel plants that were illegally launched in previous years. The province's energy-saving department has already greeted these manufacturers. "Now steel is a product with overcapacity, exports can't go out, and production is more inventory. We let them prepare," the source said.
The reporter also learned from some provinces and cities in the east that some provinces and cities have made it clear that some enterprises such as steel, nonferrous metals, cement and metallurgy will stop production or restrict production when necessary to ensure the completion of the “Eleventh Five-Year†energy conservation task.
It is also a last resort for these manufacturers to be discontinued. Wang Shuhua, director of the Energy Department of Hunan Statistics Bureau, told reporters that the energy consumption per unit of GDP in Hunan has declined rapidly in the past few years, which is related to the snow and ice disasters. However, in 2010, the high energy-consuming industries are growing rapidly, if there is no good way. It is very difficult to reduce energy consumption this year.
The reporter was informed that in January-February this year, the growth rate of industrial added value of industrial enterprises above designated size was 20.7%, but the national power generation increased by 22.1%, of which industrial electricity consumption increased by 30.07%, which was analyzed by energy experts as the energy consumption per unit of industrial output increased. Sign.
The National Development and Reform Commission felt that the situation was grim. The reporter was informed that the scope of the assessment of the energy conservation assessment team this year has increased compared with previous years. In the past, the focus was mainly on industry. This year, it was more comprehensive. The assessment focused on “banned†(banned use of solid clay bricks, etc.), “elimination of backwardnessâ€, “architectural constructionâ€. Energy conservation and "public institution energy conservation".
The specific assessment is to go to the local area to listen to the report, then divide into groups, and classify the local assessment. At the same time, we also focus on the fiscal energy-saving incentive projects and thousands of energy-saving action enterprises issued by the state in 2009. The locality will also report the self-inspection to the assessment team.
Local provincial and municipal personnel have indicated that they will spare no effort to increase their efforts. On March 24th, Shanxi Provincial Vice Governor Chen Chuanping said that the on-site evaluation and assessment team for the national energy-saving target responsibility said that Shanxi will further adjust and optimize the industrial structure, increase the shutdown and eliminate backward production capacity, and fully promote coal, metallurgy, coking, electric power and chemical industry. We will focus on energy-saving key projects and projects in key industries to ensure the complete completion of energy conservation and consumption reduction targets.
Non-ferrous metals, steel metallurgy and other enterprises will stop production for energy-saving targets
According to the figures released by the National Bureau of Statistics, only a handful of provinces have completed the “Eleventh Five-Year Plan†energy-saving indicators ahead of schedule. If the development of high-energy-consuming industries continues to accelerate, many localities and even the nation may not be able to play energy-saving indicators. In order to complete the energy-saving goal, local governments will stop production of some manufacturers at any cost, because once they fail to meet the standards, the governor will be punished. Next year, the National Development and Reform Commission will impose restrictions on the project.