Because the quality of the renovation works is affected by the environmental climate in varying degrees, it is not suitable for people to decorate in winter due to the inherent concept of people. In fact, the winter decoration has other advantages that are incomparable to other seasons, such as the drying of indoor air in winter, the drying of paint is faster, and the adsorption of dust particles in the air is reduced, and the color, quality and other effects of the brush are excellent; the moisture content in the wood Also reached the lowest point of the year, at this time the decoration can basically eliminate the phenomenon of cracking and deformation. So, as long as technically control the winter prone problems, winter will be a great opportunity for decoration. Different construction techniques and schemes should be adopted for different climate characteristics so that the winter decoration can give full play to its superiority in climate characteristics. The traditional winter decoration is to solve the problems that can arise in the winter, such as woodworking work to leave seams, putty scraping too thick, tiles and floor tiles warm and then paste. Prior to construction, the decoration company shall be equipped with humidification and heating equipment on site to adjust the environment of the construction site to meet the process requirements for the effects of temperature and humidity on materials and processes to varying degrees. At the same time, materials such as wood, tiles, and paint shall be applied. Classification processing, and sealed in a constant temperature and humidity for three days before construction. Three days of indoor and outdoor convection ventilation are also required after completion to observe carefully whether there is any accidental change. As long as you pay more attention to the following problems that are prone to winter, you can ensure the smooth completion of home improvement. >>>This site friend decoration experience vomiting blood summary Wood deformation Solution: The main materials used in the decoration, especially the wood, need to be placed in a room with heating equipment for three to five days to evaporate the moisture that is produced due to temperature changes. This is done so that the moisture content of the wood is close to the level in the house, so that wooden deformation after the decoration can be avoided. Veneer cracking Solution: After the panel has been transported to the construction site, apply a dry towel to wipe off the dust and apply the brush twice to the back. All the decorative panels should be laid flat, with a large core board on the bottom and a large core board on the top, which cannot stand upright. This will prevent the panel from cracking and warping. Experience talk Lacquer Interior Decorating Coatings Flooring Tiles Tiles Tiles Tiles Floor Tiles Ld Tiles Check Valves,Check Valve ,Double Check Valve,Wafer Check Valve WENZHOU DIYE VALVE&FITTINGS CO.,LTD , https://www.diye-valve.com
Qijia Classroom: How to Control the Prone Problems in Winter Decoration
1 2 Next> Total 2 Page
Page to page