1. User technical experts go to the production plant for production supervision This actually includes the components of the product acceptance, which is a link that should be carried out for important equipment; the user representative should find any processing quality and raw material problems in the production plant, and promptly point out the requirements, and ask the manufacturer to correct it. 2. Packing inspection before delivery The inspection of the user representative before the delivery at the place of production, which is also necessary for some important equipment; the user representative checks the packing project at the packing site according to the agreement, and finds that the missing, wrong, and packaging problems should prompt the supplier to correct the problem. . 3. Acceptance of the place of arrival (or port) The user representative will go to the venue (station, dock) to check whether the quantity of the goods and the appearance of the box are damaged, flooded, corroded and mildewed. If such a situation is found, the company should be promptly notified to the delivery company and photographed or videotaped as a transportation. The basis for a company or insurance company claim. 4. Storage inspection and acceptance After the equipment arrives at the user's location, it is opened, inspected, inspected, and stored in accordance with the contract and packing list. The contents of the unpacking inspection are: whether the packaging box and the inner packaging are damaged; whether the model, specifications and accessories of the arrival equipment are in conformity with the contract; according to the non-assembly and packaging of the parts and parts, whether it matches the packing list; whether the appearance of the parts is rusted, Damage phenomenon; whether the random technical documents, drawings and software are complete; When the imported equipment is unpacked, it shall be notified to the State Commodity Inspection Department to send personnel to participate. If the quality problem or quantity shortage is found, the State Commodity Inspection Department will issue a certificate to increase the trade channel to negotiate the claim. According to the general practice, the contract stipulates that within three months of the arrival of the goods at the port, the user can claim the quality and shortage problem with the certificate of the State Administration of Commodity Inspection. For problems that must be installed and tested before they can be found, they can claim within one year on the basis of the national commodity inspection certificate. Therefore, the user should open the box inspection in time for the imported equipment, and install the test vehicle in time to avoid the problem of finding out too late, exceeding the prescribed time limit for claims. 5. After the installation, the dry running test acceptance After the equipment is installed, the air operation test is carried out. The equipment management department cooperates with the process department and the use department to maintain the accuracy of equipment installation, whether the equipment transmission, operation, control, lubrication, hydraulic, pneumatic and other systems are normal, sensitive and reliable. Check and record the technical parameters and operating status parameters (such as noise, vibration, etc.) and sign the no-load test acceptance report if necessary. 6. After installation, load test acceptance The main inspection equipment is within the specified load range and the working capacity under load. It can be combined with the actual product processing test of the enterprise. In the load test, the vibration, noise, temperature of the parts (such as bearings), leakage of the hydraulic and pneumatic system, leakage of the lubrication system, operation, transmission, control, automatic function, safety and environmental protection devices are normal and stable. reliable. 7. After the installation, the accuracy check acceptance According to the accuracy requirements and inspection procedures specified in the contract, the inspection shall be carried out item by item. Take good notes. 8. Completion acceptance of equipment installation engineering The equipment management department is the mainstay, and the relevant personnel such as the process, use, inspection and installation departments participate in the phase-by-stage inspection record, the dry-run test, the load test, the accuracy inspection record, and refer to the relevant installation quality standards and agreement requirements. After the qualification is confirmed and confirmed, the installation department fills in the equipment installation completion acceptance form, and the equipment management department and the use department jointly sign the contract and can be completed. After the boilers, pressure vessels, inflammable and explosive equipment, highly toxic production equipment, manned tools, radioactive materials and other equipment are installed, they should also be inspected and approved by the relevant inspection and supervision department designated by the State before final acceptance. The acceptance work at all stages should be meticulous, serious, and carefully recorded. If necessary, you can take photos and video for evidence. Foreign equipment should also be inspected by the State Commodity Inspection Department. For the installation adjustment problem, the relevant responsible department should be arranged to correct it in time. Where it belongs to the original design, manufacturing and processing quality, packaging and transportation problems, it shall promptly submit remediation and claims to the manufacturer and supplier. After the inspection of each link proves that the equipment does meet the contract requirements, the equipment management department and the production and use department formally sign and accept. Source: Equipment Management Network Stainless Steel Emergency Driver
LED Emergency Driver tube is more suitable for installation in the lamp tube , slender shape with stainless steel shell . The hardness of the stainless steel case is high , which can more effectively protect the emergency conversion kit circuit board and battery . The emergency power backup with multiple protection function is equipped with a recyclable rechargeable lithium ion battery , so that its service life is longer .
Emergency Light Driver,Led Emergency Light Kit,Emergency Conversion Kit,Led Emergency Backup Lighting Kit Jiangmen City Pengjiang District Qihui Lighting Electrical Appliances Co., Ltd , https://www.qihuilights.com
The powder equipment was bought back, how to accept it?
When the majority of non-metallic powder enterprises purchase new equipment, the acceptance of the equipment is very important and can be carried out in several stages.