Decoration to the ground acceptance link, ground leveling is also a key part. However, which grounds are to be leveled and which grounds are not level, you know? There are many methods for leveling. Which one is more suitable for your own family. Have you ever thought about it? There are also many details on the acceptance of the ground. If there is time, the supervision of the workers can be more assured! Ground acceptance depends on the unevenness of the ground. You can use a 2-meter ruler to perform carpet-type measurements on the house (same position requires cross-direction measurement). If a gap larger than 3mm appears below the ruler, it means that the ground is not flat. It is basically flush. Installing floors on uneven ground will cause problems such as empty sound, broken locks, and foot-feeling. Therefore, whether you are installing solid wood flooring, laminate flooring, or laminate flooring, ensure that the installation area is floor-safe before installing the floor. It is flat, otherwise it is necessary to perform ground leveling before ground acceptance. 1, the balcony floor does not need to level with the living room, bedroom, usually the balcony floor will be lower than the indoor floor, in order to prevent the balcony water within the irrigation. 2, kitchen, bathroom floor does not need to level with the living room, kitchen and toilet ground easy to save water, usually lower than the living room floor. 3. The living room with tiled floor does not need to be leveled with the bedroom floor. Floor-mounted tiles will increase 3-4cm, and floorboards will increase 2cm. If two floors are leveled, height difference will occur after installation. 1ã€3 ground leveling methods Machine grinding plus plaster leveling - no increase in the ground, 3 days after the construction of wood floors, affordable price Cement mortar leveling - 2 cm above ground, 15 days after construction, wood flooring, moderate price Self-leveling leveling - operating at the highest point of the room, after 15 days of construction, wooden flooring can be installed at the highest price 2. The leveling of the ground is a matter of increasing the decoration costs and the height of the space. It does not necessarily have to be level, and it can be achieved in Shunping. 3. After leveling the ground with cement mortar, be sure to wait for the ground to dry before installing the floor. 4, the method of measuring whether the ground is dry A piece of plastic film was placed on the ground. After one day, the floor was not wet and there was no water on the membrane, which proved that the ground water content and the ambient humidity were in balance. On the contrary, it proved to be moisture-laden to the indoor environment and did not dry out. Floor Acceptance Decoration Points Nature Floor Space Cement Interior Decor Room Decoration Living Room Floor Tiles Bathroom Tiles Floor Tiles Tiles Price Kitchen Tiles Balcony Tiles YJCB is a leading manufacturer specialized in providing non-stick carbon steel Bakeware in China. Nonstick Bakeware,Bakeware Tools,Carbon Steel Cake Mold,Silicone Soap Mold Yangjiang YJCB Trade Co., Ltd , https://www.cbprokitchen.com
High quality long-lasting nonstick inside and out, perfect for all of your baking needs.
Easy cleaning and maintenance, Can be used safely in the oven baking.
We hope to cooperate with more customers for mutual development and benefits.Buyers are welcome to contact us!
Leveling the ground, the text tells you how to do it