With the continuous improvement of the economic level, many real estate companies are taking high-end routes, so the cost is also increasing. Although it is time-saving and labor-saving to buy hardcover rooms, the public is still more inclined to choose rough rooms. Then, what is the rough room? What need to pay attention to when checking the rough room? Let's look at it together with Xiaobian. What is a rough room What is a rough house? The rough house is also called a first-decoration house or a clear water house. This kind of house is basically without a door. Its walls and ground are only processed through the foundation. All exterior and interior finishes of the house, including balconies and rain covers, are to be completed in accordance with design documents, and various test items are to be completed as required. There are also a variety of pipelines should also be carried through the water, pressure test, pass ball test and commissioning of heating and heat inspection and other acceptance work. Precautions for acceptance of rough house 1. All exterior finishes inside and outside the rough house, as well as some other exterior finishes such as balconies, should be completed according to the decoration design. 2. Each room in the door should use prefabricated floor slabs, and it must not be plastered or putty leveled so that there will be no cracks in the slab seams, and there will be no mistakes in the slab seams. The surface will be flat, the color will be basically uniform, and the line angle will be smooth. straight. The concrete on the ground floor of each room within the door should be flat and compacted to achieve a firm bond and no cracks. 3. All types of pipelines in the rough room should be checked for water, pressure test, pass ball, etc. 4, blank room must be in accordance with the standard waterproof requirements, the indoor room in various rooms must strictly abide by the construction requirements of the waterproof protective layer to plan, in the acceptance should be carried out two impoundment test, so that no leakage. 5. The common parts of the rough room and the use of facilities, electrical equipment, etc. must be completed in accordance with the decoration design, and complete various test items as required. 6. The test of the blank room for water storage and water dripping, as well as the floor drain and flushing water shall comply with the design requirements. It must be achieved without pouring water, and the joint shall be smooth and smooth without leakage. 8. The elevation of the concrete ground floor of each room in the rough room must be set aside in advance for the height dimension of the decoration. The article is summarized: The above is about what is the rough room and rough room acceptance matters related to the inspection, rough room is only a new brick house, need to be renovated before design can stay. Through the contents of the Xiao Bian introduction, everyone has a basic understanding of the rough room. If you want to learn more about the relevant knowledge, please continue to pay attention to this site. smart light,Rgb Led Strip Lights,Smart Led Strip Lights,Color Changing Led Strip Lights Guangdong Smart Street Lighting Co., Ltd , https://www.gdfldlight.com
What are the precautions when accepting blank house rough house acceptance