Steps for commissioning concrete mixing plant equipment

After the concrete mixing station equipment is installed, the commissioning of the concrete mixing plant equipment is also an essential step. After installation and commissioning, it can be used with confidence. Below, Xiaobian explains the debugging steps for everyone.

1. When debugging the control system, first reset the emergency button, close the power switch in the electrical cabinet, turn on the circuit breakers, control circuit power switch, and control room power switch in turn, observe whether the electrical system has abnormal Phenomenon, if there is an immediate check;

2. Turn on the buttons of each motor, and check if the steering of the motor is correct. If it is incorrect, it should be adjusted immediately;

3. Start the air pump of the equipment of the concrete mixing station. After the air pressure reaches the requirement, start the air control doors in sequence according to the button labeling to check whether the operation is flexible; and adjust the zero and adjust the sensitivity of the computer;

Check the air compressor switch is normal, barometer display is correct, the safety valve pressure adjustment to the standard range;

4. Perform trial run on the mixer to see if there is abnormal sound and whether each component is working properly;

5. When the belt conveyor is being debugged, it needs to be operated. During the running process, check whether each idler operation is flexible. Observe the belt carefully. There should be no swaying, running deviation, edging, slipping, deformation, etc.;

6. When commissioning the concrete batching machine, be sure to press the ingredients button more than once to see if it is flexible and can be configured with precision, and then adjust the ingredients reference.