The rough room renovation steps will let you learn

Speaking of rough rooms, I believe we are not unfamiliar, rough room is completely unrenovated house. Need to design and decorate before they can stay, many of my friends are getting scared when they get a new rough room, do not know how to decorate? Xiao Bian today introduced the most detailed steps for the renovation of the rough house , hoping to bring help to newcomers who need it.

1, blank room renovation steps - measurement

Before the renovation of the rough house, all dimensions of the house must be measured in person and then marked with a ruler and marked clearly. Such as: tiling area, wall paint area, wallpaper area, floor area, etc., but also measure the size of the wall surface, so as to facilitate the placement of furniture in the future.

2, rough room renovation steps - the main demolition reform

The demolition of the main body is the first project for the decoration of rough houses, which mainly consists of wall removal, wall cladding, and shovel wall covering. Attention should be paid to the timely removal of garbage that has been demolished and modified to facilitate later construction.

3, rough house renovation steps - hydropower reform

When hydropower is reformed, it is necessary to determine the exact location of switches, lamps, basins, bathtubs, and washing machines. Otherwise it will be too late to regret later. Before the hydropower reform, kitchen cabinet designers will come to the door for the first time to determine the location of the power supply and the waterway.

4, blank room renovation steps - tiling

Before tiling, you must buy a floor drain, such as a washing machine or shower to buy a special deodorant floor drain. After the floor has finished waterproofing and brushing, it is ready for tiling. Before tiling, tiles need to be soaked in water and dried in the shade. When paving, attention must be paid to the overall beauty of the tile, and there must be no color difference.

5, rough room renovation steps - oil workers

Now do the mixing, are used spray. Workers can spray white on the inside of the door and the meter box. Before brushing the wall, you need to level, polish, roll brush and other processes before you can. If the wall is to be painted, color must be taken care of. Walls generally need to brush 2 times of paint, some even 3 times.

6, blank room renovation steps - wallpaper

After the wall paint has been painted, the oil trader will apply nitro-lacquer to the place where the wallpaper is to be applied. The paint can be dried after the next day, and the master can come and paste the wallpaper.

7, blank room renovation steps - install socket panel, kitchen ceiling

The next step is to install the socket panel. Generally it can be installed in half a day. When installing the ceiling, it is recommended to install the water heater and Yuba first, so that the ceiling edge seal can better half-package water heaters, and also more beautiful convergence.

8, blank room renovation steps - cabinet installation

When the kitchen cabinet is installed, it is necessary to arrange the hood, stove and sink in advance. It is best to send it on the same day and install it with the kitchen cabinet. It is also possible for kitchen cabinet makers to bring together artificial stone countertops where the cookers and sinks are trimmed. It is also good to include a water meter and pipes.

9, blank room renovation steps - install the finished door and hardware, sanitary ware, lamps

Finished doors need to be installed before the floor is installed, because the installation steps are complicated and there are many tools. If you install the floor first, you may worry about scratching or damage the floor. Of course, before installing the floor, you can also install the clothes rack, curtain rods, and lamps.

10, rough room renovation steps - install the floor

Flooring must be leveled before installation. Otherwise, after the floor is laid, it will be easy to walk.

11, rough room renovation steps - furniture, appliances approach

After the floor is laid, you can move furniture and home appliances, such as beds, mattresses, wardrobes, shoe cabinets, sofas, dining tables, and so on. It is recommended that the new house be ventilated for a period of three months to six months.

Conclusion: The above is to introduce the relevant content of the rough room renovation steps , I hope to help everyone. If you need to learn more about the later stage, please pay attention to the information on this site.